TechTalk
Cut costs with strong automation design for distribution systems | TechTalk
To take a closer look at the physical model, a basic principle for structuring plant equipment into units is that a unit can never hold more than one batch. For example, if a tank and the distribution loop for a water system are placed in separate units , possibly due to a special system configuration, this means the operation of the two units need to be coordinated. Ultimately, a poor definition of units makes the automation solution more...